Project Completion Certificate (Ground Water)
Scheme ID: 20066055 Name of Scheme: DHARAVA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 14460 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 05-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 51.06 M / 165.99 M Dharava 26.330083 81.945991
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 975 LPM / 50 M Dharava 26.330083 81.945991
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 550 KL / 14 M Dharava 26.330083 81.945991
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.719
2 DI / K7 250 0.304
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 22.5
2 HDPE / PN-6:Class PE-100 75 2.822
3 HDPE / PN-6:Class PE-100 90 2.75
4 HDPE / PN-6:Class PE-100 110 1.421
5 HDPE / PN-6:Class PE-100 125 0.949
6 HDPE / PN-6:Class PE-100 140 0.614
7 HDPE / PN-6:Class PE-100 160 2.353
8 HDPE / PN-6:Class PE-100 180 0.192
9 HDPE / PN-6:Class PE-100 200 0.671
HSC Connection
Sno. Total Nos.
1 1773
Other Details
7.27
0.00
7.42
05-Jun-2025
01-Nov-2025