Project Completion Certificate (Ground Water)
Scheme ID: 20066064 Name of Scheme: KHARAGPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3264 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 03-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150mm PLAIN PIPE 11.30 KHARAGPUR 26.13762 81.96379
2 300mm PLAIN PIPE 54.00 KHARAGPUR 26.13762 81.96379
3 150mm SLOTTED PIPE 4.00 KHARAGPUR 26.13762 81.96379
4 300mm SLOTTED PIPE 12.00 KHARAGPUR 26.13762 81.96379
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 550 LPM / 50 M KHARAGPUR 26.13762 81.96379
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 M KHARAGPUR 26.13762 81.96379
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 0.508
2 HDPE PIPE 75 0.333
3 HDPE PIPE 63 17.325
4 HDPE PIPE 110 0.272
5 HDPE PIPE 140 0.206
6 HDPE PIPE 160 0.405
HSC Connection
Sno. Total Nos.
1 584
Other Details
3.09
0.00
3.09
06-Sep-2024
20-Dec-2024