| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066064 | Name of Scheme: KHARAGPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 3264 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 03-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150mm PLAIN PIPE | 11.30 | KHARAGPUR | 26.13762 | 81.96379 |
| 2 | 300mm PLAIN PIPE | 54.00 | KHARAGPUR | 26.13762 | 81.96379 |
| 3 | 150mm SLOTTED PIPE | 4.00 | KHARAGPUR | 26.13762 | 81.96379 |
| 4 | 300mm SLOTTED PIPE | 12.00 | KHARAGPUR | 26.13762 | 81.96379 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 550 LPM / 50 M | KHARAGPUR | 26.13762 | 81.96379 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 M | KHARAGPUR | 26.13762 | 81.96379 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.031 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.508 | |
| 2 | HDPE PIPE | 75 | 0.333 | |
| 3 | HDPE PIPE | 63 | 17.325 | |
| 4 | HDPE PIPE | 110 | 0.272 | |
| 5 | HDPE PIPE | 140 | 0.206 | |
| 6 | HDPE PIPE | 160 | 0.405 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 584 |