Project Completion Certificate (Ground Water)
Scheme ID: 20066074 Name of Scheme: NARSARA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2670 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26M / 74.33M Narsara 26.428247 81.903901
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible Pump-1 550 LPM / 46M Narsara 26.428247 26.428247
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 14M Narsara 26.428247 26.428247
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.014
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6: Class PE-100 63 5.472
2 HDPE/PN-6: Class PE-100 75 3.116
3 HDPE/PN-6: Class PE-100 90 0.669
4 HDPE/PN-6: Class PE-100 110 1.183
5 HDPE/PN-6: Class PE-100 125 0.036
6 HDPE/PN-6: Class PE-100 140 0
7 HDPE/PN-6: Class PE-100 160 0.659
8 HDPE/PN-6: Class PE-100 180 0
9 HDPE/PN-6: Class PE-100 200 0
HSC Connection
Sno. Total Nos.
1 501
Other Details
2.15
0.00
2.19
29-Jan-2025
01-Feb-2025