| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066080 | Name of Scheme: ASRAFPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3040 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 12-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 70.05 / 20 | Asrafpur | 26.438440 | 81.829212 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 620LPM/ 46M | Asrafpur | 26.438440 | 81.829212 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/ 14M | Asrafpur | 26.438440 | 81.829212 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/ K7 | 125 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN-6: CLASS PE-100 | 63 | 7.264 | |
| 2 | HDPE/PN-6: CLASS PE-100 | 75 | 1.892 | |
| 3 | HDPE/PN-6: CLASS PE-100 | 90 | 1.087 | |
| 4 | HDPE/PN-6: CLASS PE-100 | 110 | 0.291 | |
| 5 | HDPE/PN-6: CLASS PE-100 | 125 | 0.525 | |
| 6 | HDPE/PN-6: CLASS PE-100 | 140 | 0.59 | |
| 7 | HDPE/PN-6: CLASS PE-100 | 160 | 0.18 | |
| 8 | HDPE/PN-6: CLASS PE-100 | 180 | 0 | |
| 9 | HDPE/PN-6: CLASS PE-100 | 200 | 0 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 550 |