Project Completion Certificate (Ground Water)
Scheme ID: 20066089 Name of Scheme: PICCHAUTI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 5312 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Dec-2024 Actual Date of Completion (Capex): 12-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 32.30 PICCHAUTI 26.505778 81.717992
2 300 MM PLAIN PIPE 62.00 PICCHAUTI 26.505778 81.717992
3 150 MM SLOTTED PIPE 9.00 PICCHAUTI 26.505778 81.717992
4 300 MM SLOTTED PIPE 21.00 PICCHAUTI 26.505778 81.717992
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 900 LPM / 52 M PICCHAUTI 26.505778 81.717992
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL / 14 M PICCHAUTI 26.505778 81.717992
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 5.090
2 HDPE PIPE 63 13.930
3 HDPE PIPE 110 0.636
4 HDPE PIPE 140 0.665
5 HDPE PIPE 160 1.220
HSC Connection
Sno. Total Nos.
1 704
Other Details
4.61
0.00
4.51
16-Aug-2024
05-Dec-2024