| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066089 | Name of Scheme: PICCHAUTI WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 10 |
| Total Population Covered: 5312 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Dec-2024 | Actual Date of Completion (Capex): 12-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MM PLAIN PIPE | 32.30 | PICCHAUTI | 26.505778 | 81.717992 |
| 2 | 300 MM PLAIN PIPE | 62.00 | PICCHAUTI | 26.505778 | 81.717992 |
| 3 | 150 MM SLOTTED PIPE | 9.00 | PICCHAUTI | 26.505778 | 81.717992 |
| 4 | 300 MM SLOTTED PIPE | 21.00 | PICCHAUTI | 26.505778 | 81.717992 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 900 LPM / 52 M | PICCHAUTI | 26.505778 | 81.717992 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 KL / 14 M | PICCHAUTI | 26.505778 | 81.717992 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 5.090 | |
| 2 | HDPE PIPE | 63 | 13.930 | |
| 3 | HDPE PIPE | 110 | 0.636 | |
| 4 | HDPE PIPE | 140 | 0.665 | |
| 5 | HDPE PIPE | 160 | 1.220 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 704 |