Project Completion Certificate (Ground Water)
Scheme ID: 20066347 Name of Scheme: SEWARA WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 21
Total Population Covered: 4940 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 54.09 M / 140.60 M Sewara 26.402608 82.052819
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible Pump-1 & 2 490 LPM / 48 M Sewara 26.402608 82.052819
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 12 M Sewara 26.402608 82.052819
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 125 1.235
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6: Class PE-100 63 20.925
2 HDPE/PN-6: Class PE-100 75 1.970
3 HDPE/PN-6: Class PE-100 90 0.670
4 HDPE/PN-6: Class PE-100 110 1.167
5 HDPE/PN-6: Class PE-100 125 0.134
6 HDPE/PN-6: Class PE-100 140 0
7 HDPE/PN-6: Class PE-100 160 0.255
8 HDPE/PN-6: Class PE-100 180 0.12
9 HDPE/PN-6: Class PE-100 200 0
HSC Connection
Sno. Total Nos.
1 967
Other Details
4.00
0.00
4.08
11-Jan-2025
01-Feb-2025