| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066396 | Name of Scheme: DHOBI BHAR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 9 |
| Total Population Covered: 3930 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 18-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.03 M / 112.32 M | DHOBI BHAR | 26.4710031 | 82.0619966 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 520 LPM / 50 M | DHOBI BHAR | 26.4710031 | 82.0619966 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16 M | DHOBI BHAR | 26.4710031 | 82.0619966 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 125 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 13.146 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 2.596 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 1.005 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 0.137 | |
| 5 | HDPE / PN-6: Class PE-100 | 140 | 0.696 | |
| 6 | HDPE / PN-6: Class PE-100 | 160 | 0.201 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 383 |