| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066413 | Name of Scheme: babu pur Sharia water supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 3301 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 12-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21.03 M / 107.9 M | babupur Sharia | 29.05589 | 77.647008 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 700 LPM / 54 M | Babupur Sharia | 29.05589 | 77.647008 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /16 M | Babupur Sharia | 29.05589 | 77.647008 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.023 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.016 | |
| 2 | HDPE | 90 | 3.354 | |
| 3 | HDPE | 125 | 0.620 | |
| 4 | HDPE | 160 | 0.521 | |
| 5 | HDPE | 180 | 0.175 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 496 |