| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066423 | Name of Scheme: KAPOORPUR KATRI & JALALPUR AMARA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 5 | No. of Habitation Covered: 10 |
| Total Population Covered: 4246 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 31-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18.00 M / 43.50 M | KAPOORPUR KATRI & JALALPUR AMARA | 27.066019 | 79.931859 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 900 LPM / 68 M | KAPOORPUR KATRI & JALALPUR AMARA | 27.066019 | 79.931859 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250 KL / 16 M | KAPOORPUR KATRI & JALALPUR AMARA | 27.066019 | 79.931859 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 0.01530 | Pump House to OHT |
| 2 | DI | 150 | 0.00850 | Pump House to OHT |
| 3 | DI | 200 | 0.00760 | Pump House to OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.57320 | Distribution Network |
| 2 | HDPE | 90 | 2.61530 | Distribution Network |
| 3 | HDPE | 125 | 0.91380 | Distribution Network |
| 4 | HDPE | 140 | 0.636 | Distribution Network |
| 5 | HDPE | 180 | 0.69860 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 821 |