| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066432 | Name of Scheme: SAINI GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 3200 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 12-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 89.81 M /35.01 M | SAINI | 26.454441 | 81.837662 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 680 LPM /50 M | SAINI | 26.454441 | 81.837662 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL / 18 M | SAINI | 26.454441 | 81.837662 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI /K7 | 125 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 8.953 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 2.037 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 0.559 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 0.968 | |
| 5 | HDPE / PN-6: Class PE-100 | 125 | 1.41 | |
| 6 | HDPE / PN-6: Class PE-100 | 140 | 0.751 | |
| 7 | HDPE / PN-6: Class PE-100 | 160 | 0.208 | |
| 8 | HDPE / PN-6: Class PE-100 | 180 | 0.306 | |
| 9 | HDPE / PN-6: Class PE-100 | 200 | 0 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 463 |