Project Completion Certificate (Ground Water)
Scheme ID: 20066481 Name of Scheme: SARAV & MUDWA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 5 No. of Habitation Covered: 14
Total Population Covered: 5740 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 44.02M/ 327.05M Sarav Mudwa 26.396835 82.014432
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 & 2 595 LPM/ 50 M Sarav Mudwa 26.396835 82.014432
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 16 M Sarav Mudwa 26.396835 82.014432
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 125 0.760
2 DI/ K7 200 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/ PN-6: Class PE-100 63 19.311
2 HDPE/ PN-6: Class PE-100 75 2.048
3 HDPE/ PN-6: Class PE-100 90 2.534
4 HDPE/ PN-6: Class PE-100 110 3.529
5 HDPE/ PN-6: Class PE-100 125 0.355
6 HDPE/ PN-6: Class PE-100 140 1.867
7 HDPE/ PN-6: Class PE-100 160 0.559
8 HDPE/ PN-6: Class PE-100 180 1.010
9 HDPE/ PN-6: Class PE-100 200 0.420
HSC Connection
Sno. Total Nos.
1 974
Other Details
5.10
0.00
5.20
31-Jan-2025
01-Feb-2025