| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066504 | Name of Scheme: CHANDIAPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 3965 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 31-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tubewell | 25 m / 116.32 m | chandiapur | 79.821003 | 26.955582 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 850 lpm / 61 m | chandiapur | 79.821003 | 26.955582 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | oht-1 | 250 kl / 14 m | chandiapur | 79.821003 | 26.955582 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.0148 | |
| 2 | DI PIPE | 125 | 0.0193 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 5.528 | |
| 2 | HDPE PIPE | 90 | 2.388 | |
| 3 | HDPE PIPE | 110 | 2.06 | |
| 4 | HDPE PIPE | 140 | 1.928 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 819 |