| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066526 | Name of Scheme: PACHORE GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2815 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 31-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.00 M / 127.32 M | Pachore | 27.01664432 | 79.77700587 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 600 LPM / 66 M | Pachore | 27.01664432 | 79.77700587 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL / 14 M | Pachore | 27.01664432 | 79.77700587 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.0041 | Pump House to OHT |
| 2 | DI | 100 | 0.01595 | Pump House to OHT |
| 3 | DI | 150 | 0.00685 | Pump House to OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.271 | Distribution Network |
| 2 | HDPE | 90 | 1.4416 | Distribution Network |
| 3 | HDPE | 110 | 1.6403 | Distribution Network |
| 4 | HDPE | 140 | 0.2285 | Distribution Network |
| 5 | HDPE | 180 | 0.3653 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 620 |