Project Completion Certificate (Ground Water)
Scheme ID: 20066532 Name of Scheme: BISANDHUA & JASPURAPUR SARAIA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 4538 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.00/103.82 BISANDHUA & JASPURAPUR SARAIA 26.9976322 79.5643828
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSBIBLE PUMP 900/73 BISANDHUA & JASPURAPUR SARAIA 26.9976322 79.5643828
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 BISANDHUA & JASPURAPUR SARAIA 26.9976322 79.5643828
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.0097 RISING MAINS
2 DI 150 0.0073 RISING MAINS
3 DI 200 0.0072 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.91 DISTRIBUTION
2 HDPE 63 6.91 DISTRIBUTION
3 HDPE 110 1.17 DISTRIBUTION
4 HDPE 140 0.189 DISTRIBUTION
5 HDPE 160 1.15 DISTRIBUTION
6 HDPE 180 0.237 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 889
Other Details
4.11
4.06
4.11
19-Jul-2024
20-Jul-2024