| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066536 | Name of Scheme: BARSANDA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 6741 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Dec-2023 | Actual Date of Completion (Capex): 21-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL 1 | 26.10 / 75.33 | BARSANDA | 26.513265 | 81.618302 |
| 2 | TUBEWELL 2 | 28.05 / 80 | BARSANDA | 26.51441 | 81.614764 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE 1 | 725 LP M / 26 M | BARSANDA | 26.513265 | 81.618302 |
| 2 | SUBMERSIBLE 2 | 725 LP M / 26 M | BARSANDA | 26.513265 | 81.618302 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 400 KL / 180 M | BARSANDA | 26.513265 | 81.618302 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.686 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.028 | |
| 2 | HDPE | 90 | 4.820 | |
| 3 | HDPE | 110 | 0.978 | |
| 4 | HDPE | 125 | 1.460 | |
| 5 | HDPE | 140 | 0.997 | |
| 6 | HDPE | 180 | 0.854 | |
| 7 | HDPE | 200 | 1.123 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1179 |