| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066542 | Name of Scheme: BHATTHI JARAULI & PAIGAPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 5430 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 44.03M/ 150.63M | Bhatthi Jarauli & Paigapur | 26.296402 | 82.048858 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible Pump-1 & 2 | 570 LPM / 50M | Bhatthi Jarauli & Paigapur | 26.296402 | 82.048858 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 350KL/14M | Bhatthi Jarauli & Paigapur | 26.296402 | 82.048858 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 100 | 0.0203 | |
| 2 | DI/K7 | 125 | 0.360 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN-6: Class PE-100 | 63 | 15.331 | |
| 2 | HDPE/PN-6: Class PE-100 | 75 | 3.402 | |
| 3 | HDPE/PN-6: Class PE-100 | 90 | 2.421 | |
| 4 | HDPE/PN-6: Class PE-100 | 110 | 2.585 | |
| 5 | HDPE/PN-6: Class PE-100 | 125 | 0.506 | |
| 6 | HDPE/PN-6: Class PE-100 | 140 | 0.003 | |
| 7 | HDPE/PN-6: Class PE-100 | 160 | 0.609 | |
| 8 | HDPE/PN-6: Class PE-100 | 180 | 0.319 | |
| 9 | HDPE/PN-6: Class PE-100 | 200 | 0.029 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 905 |