| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066548 | Name of Scheme: MANJH GAON WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 2534 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 07-Jan-2024 | Actual Date of Completion (Capex): 12-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 34.10/70.21 | Manjh Gaon | 26.640701 | 81.572934 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump | 550 LPM | Manjh Gaon | 26.640701 | 81.572934 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16 mtr | Manjh Gaon | 26.640918 | 81.572528 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 3.77 | |
| 2 | HDPE PN-6 | 90 | 5.51 | |
| 3 | HDPE PN-6 | 110 | 2.08 | |
| 4 | HDPE PN-6 | 125 | 0.78 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 466 |