| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066551 | Name of Scheme: KHEMMAU WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 9 |
| Total Population Covered: 3530 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 11-Dec-2023 | Actual Date of Completion (Capex): 14-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.13 / 80.24 | KHEMMAU | 26.625981 | 81.605584 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 750 LPM / 52 M | KHEMMAU | 26.625981 | 81.605584 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 KL / 14 M | KHEMMAU | 26.625981 | 81.605584 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.291 | |
| 2 | HDPE | 90 | 4.464 | |
| 3 | HDPE | 125 | 0.308 | |
| 4 | HDPE | 140 | 0.743 | |
| 5 | HDPE | 180 | 2.932 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 421 |