| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066576 | Name of Scheme: DHOYEN VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 3916 | Base Year: 2023 | Intermediate Year: 2039 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Dec-2023 | Actual Date of Completion (Capex): 07-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 26/52.06 | DHOYEN | 26.118736 | 81.898464 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 800LPM/52 M | DHOYEN | 26.118736 | 81.898464 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 KL / 14 M | DHOYEN | 26.118736 | 81.898464 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.024 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.124 | |
| 2 | HDPE | 90 | 3.568 | |
| 3 | HDPE | 110 | 1.058 | |
| 4 | HDPE | 125 | 0.828 | |
| 5 | HDPE | 140 | 1.012 | |
| 6 | HDPE | 160 | 0.907 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 524 |