Project Completion Certificate (Ground Water)
Scheme ID: 20066580 Name of Scheme: URER MAU WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3530 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Dec-2023 Actual Date of Completion (Capex): 22-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 32.81 / 94.34 URER MAU 26.623642 81.653035
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750 LPM / 54 M URER MAU 26.623642 81.653035
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL / 14 M URER MAU 26.623642 81.653035
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 4.079
2 HDPE 63 9.245
3 HDPE 110 1.273
4 HDPE 125 0.487
5 HDPE 140 3.292
HSC Connection
Sno. Total Nos.
1 775
Other Details
3.72
0.00
3.69
22-Sep-2024
23-Dec-2024