Project Completion Certificate (Ground Water)
Scheme ID: 20066583 Name of Scheme: KAMOLIYA & PIKOURA GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 5060 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 38.81M/185.64M Kamoliya & Pikoura 26.278384 81.935984
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump- 1 & 2 530 LPM/ 50 M Kamoliya & Pikoura 26.278384 81.935984
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 16 M Kamoliya & Pikoura 26.278384 81.935984
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 100 0.35
2 DI/ K7 125 0.430
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/ PN-6:Class PE-100 63 16.248
2 HDPE/ PN-6:Class PE-100 75 2.194
3 HDPE/ PN-6:Class PE-100 90 0.819
4 HDPE/ PN-6:Class PE-100 110 1.26
5 HDPE/ PN-6:Class PE-100 125 0
6 HDPE/ PN-6:Class PE-100 140 0.1
7 HDPE/ PN-6:Class PE-100 160 0
8 HDPE/ PN-6:Class PE-100 180 2.605
9 HDPE/ PN-6:Class PE-100 200 1.668
HSC Connection
Sno. Total Nos.
1 873
Other Details
4.65
0.00
4.74
25-Jul-2024
01-Feb-2025