| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066593 | Name of Scheme: TENDUA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 2836 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 12-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS | 35.63.33 M | TENDUA | 26.617138 | 81.59588125 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 600 LPM/52 M | TENDUA | 26.617138 | 81.595881 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175 KL/14 M | TENDUA | 26.617138 | 81.595881 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.0205 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.989 | |
| 2 | HDPE | 90 | 2.747 | |
| 3 | HDPE | 110 | 0.194 | |
| 4 | HDPE | 125 | 0.492 | |
| 5 | HDPE | 140 | 0.427 | |
| 6 | HDPE | 160 | 0.284 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 540 |