Project Completion Certificate (Ground Water)
Scheme ID: 20066620 Name of Scheme: KANKOO PUR WATE SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2406 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-Feb-2024 Actual Date of Completion (Capex): 22-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.03 m / 107.9 m KANKOO PUR 29.056516 77.670232
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550 M / 52 M KANKOO PUR 29.056516 77.670232
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 14 M KANKOO PUR 29.056516 77.670232
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.603
2 HDPE 90 1.751
3 HDPE 140 0.633
4 HDPE 160 0.433
5 HDPE 180 0.702
HSC Connection
Sno. Total Nos.
1 490
Other Details
2.45
0.00
2.44
22-Sep-2024
23-Dec-2024