Project Completion Certificate (Ground Water)
Scheme ID: 20066626 Name of Scheme: ASNI1 WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2728 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-2024 Actual Date of Completion (Capex): 19-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.05 / 65.28 ASNI 29.136031 77.779246
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 600 / 54 ASNI 29.136031 77.779246
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 / 16 ASNI 29.136031 77.779246
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.285
2 HDPE 90 1.542
3 HDPE 110 0.519
4 HDPE 125 0.173
5 HDPE 140 0.191
HSC Connection
Sno. Total Nos.
1 467
Other Details
2.61
0.00
2.53
19-Sep-2024
20-Dec-2024