| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066641 | Name of Scheme: UTTARGAON WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 16 |
| Total Population Covered: 3726 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jan-2024 | Actual Date of Completion (Capex): 15-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 14/77.54 | UTTARGAON | 29.118012 | 77.724564 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 800/56 | UTTARGAON | 29.118012 | 77.724564 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/18 | UTTARGAON | 29.118012 | 77.724564 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.98 | |
| 2 | HDPE | 90 | 3.87 | |
| 3 | HDPE | 110 | 0.83 | |
| 4 | HDPE | 125 | 0.30 | |
| 5 | HDPE | 140 | 0.25 | |
| 6 | HDPE | 160 | 1.01 | |
| 7 | HDPE | 180 | 0.81 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 627 |