| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066647 | Name of Scheme: PARMANANDPUR VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 2310 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 28-Jan-2024 | Actual Date of Completion (Capex): 25-Aug-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X150 | 18.1 M/206.7 M | PARMANANDPUR | 25.681101 | 82.898112 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 7.5 HP | 500 LPM/44 M | PARMANANDPUR | 25.681101 | 82.898112 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL /12 M | PARMANANDPUR | 25.681186 | 82.897931 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 100 | 0.0202 | YES |
| 2 | DI, K-7 | 200 | 0.0035 | YES |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.633 | YES |
| 2 | HDPE | 75 | 3.041 | YES |
| 3 | HDPE | 63 | 6.965 | YES |
| 4 | HDPE | 110 | 0.811 | YES |
| 5 | HDPE | 125 | 0.145 | YES |
| 6 | HDPE | 160 | 0.414 | YES |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 370 |