Project Completion Certificate (Ground Water)
Scheme ID: 20066727 Name of Scheme: SARAI & BAGGA & TAUDHIKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 4510 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.07M/ 55.48M Sarai & Bagga Taudhikpur 26.537252 81.78747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump- 1 950 LPM/ 50 M Sarai & Bagga Taudhikpur 26.537252 81.78747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 18 M Sarai & Bagga Taudhikpur 26.537252 81.78747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/ PN-6: Class PE-100 63 9.887
2 HDPE/ PN-6: Class PE-100 75 2.553
3 HDPE/ PN-6: Class PE-100 90 0.758
4 HDPE/ PN-6: Class PE-100 110 0.866
5 HDPE/ PN-6: Class PE-100 125 1.275
6 HDPE/ PN-6: Class PE-100 140 0
7 HDPE/ PN-6: Class PE-100 160 0.199
8 HDPE/ PN-6: Class PE-100 180 2.142
9 HDPE/ PN-6: Class PE-100 200 0
HSC Connection
Sno. Total Nos.
1 809
Other Details
4.15
0.00
4.23
11-Jan-2025
01-Feb-2025