Project Completion Certificate (Ground Water)
Scheme ID: 20066830 Name of Scheme: AZAMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2033 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 02-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.28 Mtr / 96.07 Mtr AZAMPUR 29.017927 77.593438
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 200 LPM / 48 Mtr AZAMPUR 29.017927 77.593438
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 12 M AZAMPUR 29.017927 77.593438
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0289
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.830
2 HDPE 90 1.371
3 HDPE 110 0.278
4 HDPE 125 0.252
HSC Connection
Sno. Total Nos.
1 462
Other Details
1.72
1.72
1.37
19-Oct-2024
20-Oct-2024