| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066850 | Name of Scheme: FATTEPUR & USKA MAU GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 17 |
| Total Population Covered: 13100 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 12-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell-1 & 2 | 61.01 M / 176.67 M | Fattepur & Uskamau | 26.540431 | 81.733403 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump-1&2 | 870 LPM / 50 M | Fattepur & Uskamau | 26.540431 | 81.733403 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 150 | 0.020 | |
| 2 | DI / K7 | 200 | 0.455 | |
| 3 | DI / K7 | 250 | 0.480 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 17.374 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 7.051 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 1.416 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 1.331 | |
| 5 | HDPE / PN-6: Class PE-100 | 125 | 0.769 | |
| 6 | HDPE / PN-6: Class PE-100 | 140 | 2.134 | |
| 7 | HDPE / PN-6: Class PE-100 | 160 | 2.984 | |
| 8 | HDPE / PN-6: Class PE-100 | 180 | 0.493 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1412 |