Project Completion Certificate (Ground Water)
Scheme ID: 20066908 Name of Scheme: AARDIH & BAHALOLPUR GROUP OF GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 11
Total Population Covered: 4450 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 74.94 M/ 29.18 M AARDIH & BAHALOLPUR 26.217716 82.027363
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 940 LPM / 50 M AARDIH & BAHALOLPUR 26.217716 82.027363
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL / 16 M AARDIH & BAHALOLPUR 26.217716 82.027363
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/ K7 125 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE /PN-6 : Class PE -100 63 18.709
2 HDPE /PN-6 : Class PE -100 75 4.13
3 HDPE /PN-6 : Class PE -100 90 3.351
4 HDPE /PN-6 : Class PE -100 110 1.86
5 HDPE /PN-6 : Class PE -100 125 1.379
6 HDPE /PN-6 : Class PE -100 140 1.056
7 HDPE /PN-6 : Class PE -100 160 0.965
8 HDPE /PN-6 : Class PE -100 180 0.077
9 HDPE /PN-6 : Class PE -100 200 0.031
HSC Connection
Sno. Total Nos.
1 744
Other Details
4.09
0.00
4.17
26-Nov-2024
01-Dec-2024