| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066947 | Name of Scheme: BHEEKHARPUR & ETWA MALNA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 12 |
| Total Population Covered: 2990 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 12-Jan-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 23.02 M/100.34 M | Bheekharpur & Etwa Malna Pur | 26.430455 | 82.078462 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible Pump-1 | 630 LPM/ 51M | Bheekharpur & Etwa Malna Pur | 26.430455 | 82.078462 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/18M | Bheekharpur & Etwa Malna Pur | 26.430455 | 82.078462 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K7 | 125 | 0.0148 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/ PN-6: Class PE-100 | 63 | 11.837 | |
| 2 | HDPE/ PN-6: Class PE-100 | 75 | 1.693 | |
| 3 | HDPE/ PN-6: Class PE-100 | 90 | 2.231 | |
| 4 | HDPE/ PN-6: Class PE-100 | 110 | 1.337 | |
| 5 | HDPE/ PN-6: Class PE-100 | 125 | 0.125 | |
| 6 | HDPE/ PN-6: Class PE-100 | 140 | 1.781 | |
| 7 | HDPE/ PN-6: Class PE-100 | 160 | 0 | |
| 8 | HDPE/ PN-6: Class PE-100 | 180 | 0.037 | |
| 9 | HDPE/ PN-6: Class PE-100 | 200 | 0 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 511 |