Project Completion Certificate (Ground Water)
Scheme ID: 20067044 Name of Scheme: BARAM REORANISATION No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3202 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Aug-2024 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12 Mtr / 105.14 Mtr BARAM 29.065943 77.565485
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600 LPM / 50 Mtr BARAM 29.065943 77.565485
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 11 M BARAM 29.065943 77.565485
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0175
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 0.4683
2 HDPE 90 0.697
3 HDPE 110 0.420
4 HDPE 125 0.132
5 HDPE 140 0.275
HSC Connection
Sno. Total Nos.
1 598
Other Details
2.06
2.06
1.64
22-Jan-2025
25-Jan-2025