Project Completion Certificate (Ground Water)
Scheme ID: 20067058 Name of Scheme: RAMNAGAR FIRST & DHABIA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 10
Total Population Covered: 4005 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jan-2024 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.01 / 126.80 Ramnagar First & Dhabia 26.401087 81.945555
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 850 LPM / 51 M Ramnagar First & Dhabia 26.401087 81.945555
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL / 18 M Ramnagar First & Dhabia 26.401087 81.945555
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE /PN-6: Class PE-100 63 16.336
2 HDPE /PN-6: Class PE-100 75 3.415
3 HDPE /PN-6: Class PE-100 90 2.373
4 HDPE /PN-6: Class PE-100 110 1
5 HDPE /PN-6: Class PE-100 125 1.035
6 HDPE /PN-6: Class PE-100 140 0.451
7 HDPE /PN-6: Class PE-100 160 0
8 HDPE /PN-6: Class PE-100 180 0.498
9 HDPE /PN-6: Class PE-100 200 0.033
HSC Connection
Sno. Total Nos.
1 611
Other Details
3.71
0.00
3.78
30-Nov-2024
01-Dec-2024