| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067088 | Name of Scheme: BASANTPUR TIVARIPUR & MADHOPUR ACHARYA & MARHA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 8580 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 27-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 50.00 M/ 208.37 M | Basantpur tivaripur & Madhopur Acharya & Marha | 26.40882 | 81.968092 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 570 LPM / 50 M | Basantpur tivaripur & Madhopur Acharya & Marha | 26.40882 | 81.968092 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 KL / 18 M | Basantpur tivaripur & Madhopur Acharya & Marha | 26.40882 | 81.968092 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K7 | 100 | 0.812 | |
| 2 | DI / K7 | 200 | 0.251 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / PN-6: Class PE-100 | 63 | 16.931 | |
| 2 | HDPE / PN-6: Class PE-100 | 75 | 1.678 | |
| 3 | HDPE / PN-6: Class PE-100 | 90 | 1.818 | |
| 4 | HDPE / PN-6: Class PE-100 | 110 | 1.185 | |
| 5 | HDPE / PN-6: Class PE-100 | 125 | 0.454 | |
| 6 | HDPE / PN-6: Class PE-100 | 140 | 0.384 | |
| 7 | HDPE / PN-6: Class PE-100 | 160 | 1.43 | |
| 8 | HDPE / PN-6: Class PE-100 | 180 | 0.747 | |
| 9 | HDPE / PN-6: Class PE-100 | 200 | 0.547 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1155 |