Project Completion Certificate (Ground Water)
Scheme ID: 20067129 Name of Scheme: BALDANA SHAFIPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2902 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 18-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.07 /126.46 Baldana Safipur 29.19272 78.364233
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 620 /50 Baldana Safipur 29.19272 78.364233
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 / 12 Baldana Safipur 29.19272 78.364233
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.586
2 HDPE 75 0.271
3 HDPE 90 0.381
4 HDPE 110 0.132
5 HDPE 125 0.173
6 HDPE 160 0.036
HSC Connection
Sno. Total Nos.
1 446
Other Details
1.91
0.00
1.94
18-Jun-2025
19-Jun-2025