Project Completion Certificate (Ground Water)
Scheme ID: 20067135 Name of Scheme: BHAGWANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2736 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 03-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.88 Mtr / 102.4 Mtr BHAGWANPUR 29.100741 77.821981
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250 LPM / 50 Mtr BHAGWANPUR 29.100741 77.821981
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 12 M BHAGWANPUR 29.100741 77.821981
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0298
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.679
2 HDPE 90 1.392
3 HDPE 110 0.360
4 HDPE 125 0.192
HSC Connection
Sno. Total Nos.
1 627
Other Details
2.41
2.41
1.91
23-Oct-2024
24-Oct-2024