Project Completion Certificate (Ground Water)
Scheme ID: 20067151 Name of Scheme: SADHARANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3092 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 19-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.29 Mtr / 96.13 Mtr SADHARANPUR 29.031803 77.842481
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250 LPM / 48 Mtr SADHARANPUR 29.031803 77.842481
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 Kl / 12 M SADHARANPUR 29.031803 77.842481
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.223
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.077
2 HDPE 90 1.957
3 100 Kl / 12 M 110 0.463
HSC Connection
Sno. Total Nos.
1 652
Other Details
2.44
2.44
1.90
15-Jun-2025