Project Completion Certificate (Ground Water)
Scheme ID: 20067153 Name of Scheme: BEERKHET Water Supply Scheme No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 4500 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2023 Actual Date of Completion (Capex): 21-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 30.11M/61.93M Beerkhet & Hariharpur 26.446327 82.997418
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5 HP Submersible Pump 950LPM/45M Beerkhet & Hariharpur 26.446327 82.997418
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 275KL/14MTR Beerkhet & Hariharpur 26.446327 82.997418
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.04 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6:Class PE-100 90 1.308
2 HDPE Pipe PN-6:Class PE-100 75 1.304
3 HDPE Pipe PN-6:Class PE-100 63 18.546
4 HDPE Pipe PN-6:Class PE-100 110 0.798
5 HDPE Pipe PN-6:Class PE-100 140 1.180
6 HDPE Pipe PN-6:Class PE-100 160 1.742
7 HDPE Pipe PN-6:Class PE-100 180 1.809
8 HDPE Pipe PN-6:Class PE-100 200 0.694
HSC Connection
Sno. Total Nos.
1 520
Other Details
3.51
3.50
3.50
28-Apr-2025
29-Apr-2025