Project Completion Certificate (Ground Water)
Scheme ID: 20067161 Name of Scheme: BISUNPUR BAJDAHA Water Supply Scheme No. of Villages: 5 No. of Habitation Covered: 9
Total Population Covered: 4220 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2023 Actual Date of Completion (Capex): 21-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 30.15M/60.79M Bisunpur Bajdha 26.404258 82.991243
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15HP Submersible Pump 850LPM/45M Bisunpur Bajdha 26.404258 82.991243
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 250KL/14MTR Bisunpur Bajdha 26.404258 82.991243
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.04 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.463
2 HDPE Pipe PN-6: Class PE-100 75 3.251
3 HDPE Pipe PN-6: Class PE-100 63 13.099
4 HDPE Pipe PN-6: Class PE-100 110 0.485
5 HDPE Pipe PN-6: Class PE-100 125 0.219
6 HDPE Pipe PN-6: Class PE-100 140 1.174
7 HDPE Pipe PN-6: Class PE-100 160 1.661
8 HDPE Pipe PN-6: Class PE-100 200 0.384
HSC Connection
Sno. Total Nos.
1 599
Other Details
3.24
3.23
3.23
28-Apr-2025
29-Apr-2025