| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067178 | Name of Scheme: AGWASI | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3859 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 13-Jan-2023 | Actual Date of Completion (Capex): 14-Sep-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 36/207.50 | AGAWASI | 26.397755°N | 79.749678°E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERCIBLE | 810/68 | AGAWASI | 26.397755°N | 79.749678°E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/12 | AGAWASI | 26.397755°N | 79.749678°E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 9.65 | |
| 2 | HDPE PIPE | 75 | 0.684 | |
| 3 | HDPE PIPE | 90 | 0.166 | |
| 4 | HDPE PIPE | 110 | 1.799 | |
| 5 | HDPE PIPE | 125 | 0.629 | |
| 6 | HDPE PIPE | 140 | 0.252 | |
| 7 | HDPE PIPE | 160 | 0.020 | |
| 8 | HDPE PIPE | 180 | 0.678 | |
| 9 | HDPE PIPE | 200 | 1.843 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 760 |