Project Completion Certificate (Ground Water)
Scheme ID: 20067185 Name of Scheme: DAUDPUR & DEVALPUR FIRST & TIKARIYA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 13
Total Population Covered: 11250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 01-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1&2 35 M / 85.25 M DAUDPUR & DEVALPUR FIRST & TIKARIYA 26.295534 81.885911
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 745 & 740 LPM / 50 M DAUDPUR & DEVALPUR FIRST & TIKARIYA 26.295534 81.885911
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 450 KL /14 M DAUDPUR & DEVALPUR FIRST & TIKARIYA 26.295534 81.885911
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.595
2 DI / K7 250 3.124
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 26.751
2 HDPE / PN-6: Class PE-100 75 1.61
3 HDPE / PN-6: Class PE-100 90 2.194
4 HDPE / PN-6: Class PE-100 110 1.725
5 HDPE / PN-6: Class PE-100 125 0.431
6 HDPE / PN-6: Class PE-100 140 0.395
7 HDPE / PN-6: Class PE-100 160 0.632
8 HDPE / PN-6: Class PE-100 200 1.705
HSC Connection
Sno. Total Nos.
1 1507
Other Details
6.51
0.00
7.28
02-Jun-2025
01-Aug-2025