| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067224 | Name of Scheme: RASULPUR MURADNAGAR & TANDI | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3235 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 24-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.13 Mtr / 116.09 Mtr | RASULPURMURADNAGARTANDI | 29.164377 | 77.782453 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 700 LPM / 54 Mtr | RASULPURMURADNAGARTANDI | 29.164377 | 77.782453 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 Kl / 16 M | RASULPURMURADNAGARTANDI | 29.164377 | 77.782453 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0198 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.054 | |
| 2 | HDPE | 90 | 1.745 | |
| 3 | HDPE | 110 | 0.194 | |
| 4 | HDPE | 140 | 1.416 | |
| 5 | HDPE | 160 | 0.632 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 595 |