Project Completion Certificate (Ground Water)
Scheme ID: 20067263 Name of Scheme: DEVRIYA BUJURG Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 5350 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of borewell Assembly 42.16M/59.93M Devariya Bujurg 26.375697 83.004978
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 20 HP Submersible Pump 1150LPM/45M Devariya Bujurg 26.375697 83.004978
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 325KL/14M Devariya Bujurg 26.375697 83.004978
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.554
2 HDPE Pipe PN-6: Class PE-100 75 4.007
3 HDPE Pipe PN-6: Class PE-100 63 18.695
4 HDPE Pipe PN-6: Class PE-100 110 0.633
5 HDPE Pipe PN-6: Class PE-100 125 1.206
6 HDPE Pipe PN-6: Class PE-100 140 1.613
7 HDPE Pipe PN-6: Class PE-100 160 0.511
8 HDPE Pipe PN-6: Class PE-100 180 0.604
9 HDPE Pipe PN-6: Class PE-100 200 0.970
HSC Connection
Sno. Total Nos.
1 640
Other Details
4.11
4.10
4.10
23-Jul-2025
24-Jul-2025