Scheme ID: 20067349 Name of Scheme: BUDHANPUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2140 Base Year: 2023 Intermediate Year: 2038 Design Year: 2052
Date of Completion (As per Contract): 08-Mar-2024 Actual Date of Completion (Capex): 12-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of tubewell assembly 18/82.30 BUDHANPUR 26.417222 82.604024
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 ACsubmersible pumping 10HP 450 LPM BUDHANPUR 26.420 82.608
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 125/16 BUDHANPUR 26.417342 82.603869
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7/DI 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 90 mm dia HDPE Pipe PN-6: Class PE-100 90 1.31
2 75mm dia HDPE Pipe PN-6: Class PE-100 75 1.493
3 63mm dia HDPE Pipe PN-6: Class PE-100 63 4.979
4 110mm dia HDPE Pipe PN-6: Class PE-100 110 0.443
5 140 mm dia HDPE Pipe PN-6: Class PE-100 140 0.111
HSC Connection
Sno. Total Nos.
1 459
Other Details
1.76
1.78
1.78
12-Jan-2025
13-Jan-2025