Project Completion Certificate (Ground Water)
Scheme ID: 20067358 Name of Scheme: MURRA & BAUSIA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3816 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 20-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 11 M / 51.50 M MURRA & BHAUSIA 79.4572039 26.9368823
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 800 LPM / 61 M MURRA & BHAUSIA 79.4572039 26.9368823
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL / 14 M MURRA & BHAUSIA 79.4572039 26.9368823
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.02
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.72
2 HDPE 90 2.83
3 HDPE 110 1.07
4 HDPE 140 2.04
5 HDPE 160 0.59
HSC Connection
Sno. Total Nos.
1 678
Other Details
488.95
402.90
408.65
22-Jun-2024
23-Jun-2024