| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067388 | Name of Scheme: BILANDPUR & GADIA BALIDATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2293 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 22-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 18.00/132.30 | BILAND PUR & GADIA BALIDADPUR | 27.146742 | 79.752607 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 500/64 | BILAND PUR & GADIA BALIDADPUR | 27.146742 | 79.752607 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | BILAND PUR & GADIA BALIDADPUR | 27.146742 | 79.752607 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.002 | RISING MAINS |
| 2 | DI | 100 | 0.0157 | RISING MAINS |
| 3 | DI | 150 | 0.0058 | RISING MAINS |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.073 | DISTRIBUTION |
| 2 | HDPE | 63 | 3.118 | DISTRIBUTION |
| 3 | HDPE | 110 | 0.493 | DISTRIBUTION |
| 4 | HDPE | 140 | 0.297 | DISTRIBUTION |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 326 |