| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067422 | Name of Scheme: Chaukpuri water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2842 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 28-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tube Well | 30.24/126.33 | Chaukpuri | 29.319444 | 78.185708 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 560/52 | Chaukpuri | 29.319444 | 78.185708 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/16 | Chaukpuri | 29.319444 | 78.185708 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.318 | |
| 2 | HDPE | 75 | 0.127 | |
| 3 | HDPE | 90 | 0.026 | |
| 4 | HDPE | 110 | 0.108 | |
| 5 | HDPE | 125 | 0.072 | |
| 6 | HDPE | 140 | 0.135 | |
| 7 | HDPE | 160 | 0.213 | |
| 8 | HDPE | 180 | 0.028 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 604 |