Project Completion Certificate (Ground Water)
Scheme ID: 20067632 Name of Scheme: KUNWARPUR OR LODHPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2117 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.00/149.32 KUNWARPUR OR LODHPUR 27.192489 79.402248
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 450 LPM/59 M KUNWARPUR OR LODHPUR 27.192489 79.402248
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/ 12 M KUNWARPUR OR LODHPUR 27.192489 79.402248
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.016 Rising main
2 DI 150 0.0045 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.56 Distribution
2 HDPE 63 5.097 Distribution
3 HDPE 110 0.119 Distribution
4 HDPE 140 0.207 Distribution
HSC Connection
Sno. Total Nos.
1 537
Other Details
2.18
2.18
2.18
19-Jul-2024
20-Jul-2024