| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067636 | Name of Scheme: MEERPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1535 | Base Year: 2024 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 16-Aug-2024 | Actual Date of Completion (Capex): 20-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 17 M / 102.32 M | MEERPUR | 79.8362158 | 27.04368379 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 350 LPM / 49 M | MEERPUR | 79.8362158 | 27.04368379 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 50 KL / 12 M | MEERPUR | 79.8362158 | 27.04368379 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 80 | 0.0023 | |
| 2 | DI PIPE | 100 | 0.0239 | |
| 3 | DI PIPE | 150 | 0.00625 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 1.8612 | |
| 2 | HDPE PIPE | 90 | 1.423 | |
| 3 | HDPE PIPE | 110 | 0.4005 | |
| 4 | HDPE PIPE | 140 | 0.1806 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 278 |