Project Completion Certificate (Ground Water)
Scheme ID: 20067641 Name of Scheme: LOKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2692 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWLL 18.05/60.82 LOKPUR 27.138456 79.435667
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 550 LPM/59 M LOKPUR 27.138456 79.435667
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100/12 LOKPUR 27.138456 79.435667
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0105 Rising main
2 DI 100 0.015 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.073 Distribution
2 HDPE 63 4.027 Distribution
3 HDPE 110 0.299 Distribution
4 HDPE 140 0.079 Distribution
HSC Connection
Sno. Total Nos.
1 483
Other Details
2.04
2.04
2.04
03-Aug-2024
04-Aug-2024